TECHNICAL INFORMATION

TRIPARTITE LOADING METHOD (TLM)

We manufacture our bowstrings through our proprietary 3 stages of high poundage stretching process.

This meticulous method ensures no peep rotation, offers no creep and no serving separation, delivering proven consistency and stability.

JUSTRINGS INSTALLATION GUIDE

Preparation

Inspect and Photograph:
Before installation, make sure to thoroughly check your cams and cable slide for any rough edges or any irregularities (dust/dirt). Clean and smooth them out to avoid premature wear on your new string. Document clear photos of the current string and cable paths to use as a reinstallation reference.

Installation

Safety and Removal:

Place the bow into the press and apply tension to the limbs. When tightened, cut and remove the old string and cables carefully, and make sure to note their exact routing.

Installing new strings:

Start installation by bedding the yoke cables on their post. Make sure not to rub the control cables. Hook the control cables on their posts, and finally, seat the main string loops on the cam posts.
Before releasing tension, make sure that all loops and strings are properly seated in the cam grooves. While releasing tension, continue to ensure that all strings are well seated in the cam grooves. Check once more that all loops are still attached to their respective posts.

Timing and Tuning:

Use a drawboard to check whether the cams are in sync. Add or remove twists on the yoke/ control cables as needed to bring the cams into synchronization.
*Justrings Bowstrings are built precisely to your requested length. Even though this minimizes setup time, some adjustments are still needed for you to achieve desired brace height and peep alignment. Due to the precision involved in our build, we suggest keeping adjustments to a minimum: do not remove more than 2 turns or add 5-6 turns for the strings.

BUSINESS HOURS

DEALERS

INFORMATION